HORMOZ oil refinery:
 
Basic and detail design of all material handling facilities including process, civil, structural, power and instrumentation, HSE and piping work in HORMOZ refinery project , stacking and reclaiming storage area for pet-cock and sulfur materials. There are 18 belt conveyors (more than 2300m) with about 800ton/hr capacity, five lines of stacker and reclaimer, two numbers of day bins in sulfur area, feeders, de-dusting system and all other required machines. The main engineering contractor is DEXTRON group.

       
     

 

   

Download Document

   
   

 

 

 
     
 
 
 
 

Login

Home / Brief / Projects / Contact Us